![]() More filler rod and a flap sander wheel on an angle grinder is my forgiving friend. Some not so great Tig welds to putting on the cosmetic caps on the direct bolt on rack plate pegs. I can use the larger bumpers on the cable rig but the top mount to the power rack needs an additional 3" extension first.Ģ" and 1.25" pull up bar plus an accessory cross support for the top. Testing the modified tubes on the Titan cable rig with 25s then (3)10s, (2)5, (2)2.5, (2)1.25 per side. Modifying the Titan cable rig plate carriage from 1" to 2". The one drill bit cut all final cuts for the 5/8" bolt clearance. Though I broke a few center drills on a couple tubes that had a seam weld exactly in the wrong spot for my needs. All those holes had to be drilled with a spot drill then final drilling with a $28 carbide drill bit. We normally do a steak dinner there every Friday with just the fellas.īuilding it is not a real cost savings but I end up with exactly what I want and can always change it up a bit too. I did lots of the work at a buddy's machine shop. View QuoteWill do on the Trap bar project. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |